(https://www.cnbc.com/2026/05/14/cisco-csco-pops-on-ai-demand.html) data center build-out is an energy problem, but he's framing it backwards. This isn't about whether the Strait of Hormuz stays open—it's about whether U.S. grids can actually *deliver* the sustained power that hyperscaler buildouts require. A single large-scale AI cluster consumes 20-50 MW continuously. At current U.S.